Rewiring, Upgrades and New Installations
Full and partial rewiring. Older Dubai properties, villas that have been extended piecemeal, and any installation with degraded insulation, no RCD protection or undocumented circuits. Full rewiring is disruptive and we’re honest about that — it means chasing walls, and it’s best done alongside a renovation. Where a full rewire isn’t warranted, partial rewiring of the worst circuits often delivers most of the safety benefit at a fraction of the cost and disruption.
Load upgrades. Properties draw more than they did — larger AC systems, EV charging, home offices, induction cooking. A supply sized for a 2005 household is not always sized for a 2026 one. Load increases require design submission and DEWA approval.
New installations and additions. Sockets, dedicated circuits, isolators, outdoor and landscape supplies, kitchen and bathroom circuits with correct protection and bonding.
Lighting. Downlights, cove and LED strip lighting, chandeliers with the fixing properly considered, dimming and smart switching, and outdoor lighting with appropriate IP ratings. Where lighting is going into a new ceiling, coordinating with the ceiling installation at framing stage means the driver locations stay accessible and nothing gets cut into a finished surface.
EV charger installation. Growing fast, and it is a load increase with an approval route rather than a plug-in accessory. We handle the installation and the approval path together.
Renovation electrical work. Where walls are coming out anyway, that’s the moment to replace what’s behind them. We coordinate with demolition and strip-out so first fix happens while access is free rather than after it’s closed up.