Our Demolition Work Process — Survey to Site Clearance
Most clients commissioning demolition work have never done it before. Here is the sequence.
1. Free Site Survey
We attend, measure, assess the structure and its condition, identify the plot’s permitting jurisdiction, check what is adjoining, look for asbestos-containing materials in anything built before the mid-2000s, and note access constraints for plant and haulage.
2. Method Statement and Quotation
A written method statement covering sequence, plant, safety controls and waste handling, and an itemised quotation. You can see what each element costs and adjust scope accordingly.
3. Permits and NOCs
We prepare and submit the application to the correct authority, run the DEWA and telecom NOC process, and confirm disconnections are complete before mobilising.
4. Site Setup
Hoarding and fencing, exclusion zones, signage, protection to adjoining property and shared surfaces, and dust-suppression equipment in position.
5. Demolition
Soft strip first — anything recyclable or hazardous removed before the structure is touched. Then mechanical demolition in a controlled sequence with continuous water spraying for dust, and segregation of materials as they come down rather than afterwards.
6. Debris Removal and Disposal
Loading and haulage to approved facilities, with a Waste Transfer Note issued for every load.
7. Site Clearance and Handover
Plot cleared and levelled, foundations grubbed out where required, and the full disposal paperwork handed to you. If we’ve excavated, the formation is left ready for the next contractor.